Safety and Compliance

Step 01

1. Method of procedure before work begins

We meet on site, review the scope, and identify the constraints that will shape the project: outage windows, Hydro Ottawa coordination requirements, clearance requirements, and parallel trades on the schedule.

Step 02

2. Daily tailgate meetings and isolation plans

We submit a written scope, a method of procedure (MOP), and a fixed estimate or rate-basis pricing depending on the work. The MOP defines every isolation, every test, every load transfer, and the abort plan.

Step 03

3. Lockout, tagout, and arc flash discipline

Hydro Ottawa switching plans are submitted and confirmed. ESA notifications, hot work permits, and prime contractor coordination are nailed down before mobilisation. We do not mobilise until the paperwork is in place.

Step 04

4. Cleared, certified, current

Daily safety briefings, lockout tagout, and supervised switching. Live changeovers are rehearsed before the planned outage. Switching plans are signed off by every person involved before the breakers move.

Step 05

5. Documentation and post-job verification

Testing to NETA standards where applicable, ESA inspection, and a documentation package for your records and your insurer. The handoff includes switching logs, lockout records, test reports, and updated as-built drawings.

Need safety documentation for your pre-qualification file?

Coverage And Capability

We are bonded and insured at the level institutional and federal procurement teams expect: approximately five million dollars in liability coverage and one million in bonding. Documentation available on request at the bid stage.

Our coverage runs Ottawa-Carleton through Kingston. Local crews, local Hydro Ottawa relationships, local response. We hold active memberships across the major Ontario and federal electrical contracting associations.

Prev
Next
Drag
Map